Victoria Place Shopping Centre

Customer: Spence
Consultant: Hoare Lea
BMS System Installed: Honeywell Centraline
Interfaces: Modbus chiller interfaces and Modbus electrical meters
Value of Contract: Circa £200k
Completion: July 2014

A major refurbishment of the existing Victoria Place Shopping Centre above Victoria Station, including replacement of the existing M&E services and existing HVAC plant and the installation of 2 new LPHW boilers and chillers.

A new Honeywell Centraline system consisting of 3 MCCs designed, installed and commissioned to serve the main HVAC plant infrastructure and to monitor gas, water, LPHW and CHW utility meters serving both the main plant and individual retail units.

VictoriaPlaceShoppingCentre1b

UTC Elstree

Customer: HSEBS
Consultant: Design and Build
BMS System Installed: Trend
Value of Contract: Circa £150k
Completion: September 2013

2 existing office buildings were refurbished to accommodate the new University Technical College in Borehamwood.

A Trend based system consisting of 2 new MCCs serving the main HVAC plant, kitchen ventilation plant, gas proving systems and VAVs on the floor areas with local space CO2 monitoring

UniversityTechnicalCollegeElstree

City Wharf

Customer: HSEBS
Consultant: URS
BMS System Installed: Trend
Interfaces: Modbus CHP, Modbus electrical meters and MBus LPHW energy meters
Value of Contract: Circa £350k
Completion: October 2015

A new mixed use residential development for A2 Dominion comprising of 258 apartments across 4 blocks. A new Trend based BMS designed, installed and commissioned to serve the main plant infrastructure consisting of a CHP, LPHW boilers and associated ventilation systems. This included BMS monitoring of the standby generator, LV switchgear and smoke extract systems.

City-Wharf-London-N1_b

02 Telephonica

Customer: Dornan Engineering
Consultant: Red Engineering
BMS System Installed: Trend
Interfaces: Modbus- 2 UPS modules and 8 new downflow units
Value of Contract: Circa £25k
Completion: July 2014

A new MCC consisting of a Trend IQ3 and 2 Synapsis SIP Modbus vIQs, designed, installed and commissioned to serve 2 new chillers, 8 new data hall down flow units, 8 new pressurization units and LV/UPS room extract fans.

The new MCC along with the additional software and graphics were incorporated onto the existing Trend BMS network and Head End PC.

o2